Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Релейная централизация на станции Бигосово
Bigosovo is a station of the Belarusian Railway, located near the border with Latvia. In the 1950s – 1970s, according to the Lengiprotrans project, a relay interlocking system with route...
  • 1950 — 1959
  • 1960 — 1969
СЦБ и связь на участке Рига — Огре
Railway line Riga - Ogre - section of the line Riga - Aizkraukle - Krustpils of the Latvian Railway. In 1959, according to the Lengiprotrans project, the Riga - Ogre section was electrified for...
  • 1950 — 1959
  • 1960 — 1969
Устройства СЦБ и связи на станции Атбасар
Atbasar is a station in the Akmola region of Kazakhstan. In 1950-1970, during the transport development of virgin lands and coal deposits of the Kazakh SSR, Lengiprotrans developed a project for...
  • 1950 — 1959
  • 1960 — 1969
Устройства СЦБ и связи на станции Есиль
Esil is a station in the Akmola region of Kazakhstan. Trains follow through it in the directions to Astana, Kartaly, Arkalyk. In 1950-1970, during the transport development of virgin lands and...
  • 1950 — 1959
  • 1960 — 1969
Устройства СЦБ и связи на станции Железорудная
Iron ore is a station in the Kostanay region of Kazakhstan. In 1950-1970, during the transport development of virgin lands and coal deposits of the Kazakh SSR, Lengiprotrans developed a project...
  • 1940 — 1949
  • 1950 — 1959
Электрическая централизация на станции Большая Михайловка Целинной железной дороги
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) continued to work in Kazakhstan. In 1948-1955, the electrical interlocking of forty-nine turnouts was developed at the Bolshaya...
Pages