In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the restoration of the central boiler house at the Kaliningrad station.
Later, in 1970-1979, the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. In the post-war years, according to his project, production facilities were built for...
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. So, by the mid-1950s, a project was developed for plumbing workshops in Akmolinsk (since 2019 -...
In the 1940s, in the course of the development of the railway network of the Kazakh SSR, Lentransproekt (since 1951 - Lengiprotrans) developed a project for a precast concrete plant (RC) in...
Esil is a railway station in the Akmola region of Kazakhstan. Directions to Astana, Kartaly and Arkalyk pass through it.
In the period 1946-1955, Lengiprotrans designed a landfill at the...
Kostanay (now Kostanay) is a railway station in the Kostanay region of Kazakhstan. Trains to Chelyabinsk, Astana, Alma-Ata, Karaganda, Arkalyk pass through it. Suburban trains also run to...
Pages
- 1
- 2