Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1960 — 1969
  • 1970 — 1979
Очистные сооружения производственных сточных вод локомотивного депо на станции Таллин-Копли
In 1960-1980, Lengiprotrans designed a wastewater treatment plant for a locomotive depot at Tallinn-Kopli station in Estonia. The facility has developed: cross-sections, construction part,...
  • 1970 — 1979
  • 1980 — 1989
Рижский ремонтно-механический завод
In the 1970s, the former Lengiprotans Plants Department developed a project for the Riga Mechanical Repair Plant. The project provided for: - Compressor station with a capacity of 40 cubic...
  • 1970 — 1979
Пункт подготовки вагонов на станции Апатиты
In the 1970s, Lengiprotrans developed a project for the Apatity railway junction in connection with the construction of an external railway transport for the Apatity mining and processing plant (...
  • 1970 — 1979
Локомотивные и вагонные депо на станции Иваново
In the 1970s, the Lengiprotrans Plants Department (now part of the Industrial and Civil Buildings and Structures Department) carried out the design of locomotive and carriage facilities. During...
  • 1970 — 1979
Ремонтно-экипировочное депо на станции Архангельск
In the 1970s, the Lengiprotrans Plants Department (now part of the Industrial and Civil Buildings and Structures Department) carried out the design of locomotive and carriage facilities. During...