In the 1970s Lengiprotrans developed a draft general layout for the Tallinn railway junction. A feasibility study for the development of the unit was prepared.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Leningrad-Sortirovochny-Moskovsky (now St. Petersburg-Sortirovochny-Moskovsky) is the railway station of the Oktyabrskaya railway.
The station development project was developed by Lengiprotrans...
During the Soviet period, Lengiprotrans took an active part in the design of new railway lines for the development of virgin lands in the Kazakh SSR. In the 1970s, the institute developed a...
Kaliningrad-Sortirovochny is a cargo station of the Kaliningrad railway.
The station development project was developed by Lengiprotrans in the 1970-1980s. In the course of the survey,...
Novy Port is the final customs and border cargo railway station of the Putilovskaya branch of the St. Petersburg railway junction on the territory of Gutuevsky Island.
The station development...
The Ekibastuz railway junction is a large junction on the Astana-Pavlodar line, in the Pavlodar region of Kazakhstan. The city of Ekibastuz is the center of a large fuel and energy complex, known...
Pages