Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1960 — 1969
Удлинение путей на станции Йыхви
Jõhvi is a railway station on the Tallinn-Narva line in the city of the same name in Estonia. Intercity passenger and freight trains are served here. The project of lengthening the tracks at...
  • 1960 — 1969
Реконструкция водоснабжения станции Иерики
Ieriki is a railway station on the Riga-Lugazi line, which was previously part of the Pskov-Riga railway. The project for the reconstruction of the water supply at the station was developed by...
  • 1950 — 1959
  • 1960 — 1969
Генеральная схема развития Владимирского железнодорожного узла
The Vladimir railway junction is a large junction of the Gorky railway. In the 1950s – 1960s, the Department of Junctions and Stations of Lengiprotrans developed a general scheme for the...
  • 1950 — 1959
  • 1960 — 1969
Генеральная схема развития Бологовского железнодорожного узла
The Bologovsky railway junction is a large transit junction on the main line Moscow - St. Petersburg of the Oktyabrskaya railway. The following directions pass through the junction: Bologoye -...
  • 1960 — 1969
  • 1970 — 1979
Остановочный пункт Ульянка
The Ulyanka passenger stop is located on the 12th km of the Baltic line of the Oktyabrskaya railway. The directions St. Petersburg - Kalische and St. Petersburg - Gatchina-Baltiyskaya pass through...
Pages