Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
  • 1940 — 1949
Рижский железнодорожный узел
In 1930-1940s Lengiprotrans developed the general layout of the Riga railway junction. It was of strategic importance for the economic development of the Republic of Latvia and the Soviet Union as...
  • 1935 — 1939
  • 1940 — 1949
Магнитогорский железнодорожный узел
  • 1935 — 1939
  • 1940 — 1949
Барнаульский железнодорожный узел
  • 1935 — 1939
  • 1940 — 1949
Читинский железнодорожный узел
The Chita railway junction is a large junction on the Trans-Siberian Railway. In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development and reconstruction...
  • 1935 — 1939
  • 1940 — 1949
Иркутский железнодорожный узел
Irkutsk railway junction is a large junction of the East Siberian railway. In the pre-war period Lentransproekt (since 1951 - Lengiprotrans) drew up a project for the development and...
  • 1935 — 1939
  • 1940 — 1949
Владивостокский железнодорожный узел
The Vladivostok railway junction is a large transit junction of the Trans-Siberian Railway. Here, cargo is transshipped from the Vladivostok Sea Trade Port to the railroad, and cargo flows from...
Pages