Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2000 — 2009
  • 2010 — 2019
Реконструкция железнодорожного узла Юлемисте
Ülemiste is a stopping point in Tallinn on the Tallinn-Tartu and Tallinn-Narva railway lines. In 2009–2010, Lengiprotrans took part in design work for the reconstruction of the Ülemiste railway...
  • 2010 — 2019
Генеральная схема развития железнодорожного узла Санкт-Петербурга и Ленинградской области
The general scheme for the development of the railway junction of St. Petersburg and the Leningrad Region was developed by Lengiprotans in 2014. The project is aimed at the timely...
Pages