During the Soviet period, Lengiprotrans took an active part in the development of railway approaches to the commercial sea ports of the Baltic republics. This was a strategically important task,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1979-1985, the Department of Plants (now part of the OPGS) of Lengiprotrans developed a project for the Tselinograd plant of reinforced concrete structures and building parts for Dorstroytrest...
In the 1970s Lengiprotrans developed a draft general layout for the Tallinn railway junction. A feasibility study for the development of the unit was prepared.
В 1970–1980-х годах инженеры «Ленгипротранса» продолжали работу над транспортными объектами в Прибалтике. Автодорожный путепровод, расположенный на пересечении Октябрьского проспекта с улицей 21...
In the 1970s – 1980s, Lengiprotrans engineers worked on various transport facilities in Estonia. One of such objects, the pedestrian bridge across Oktyabrsky Prospekt in the III microdistrict of...
During the Soviet period, Lengiprotrans took an active part in the design of new railway lines for the development of virgin lands in the Kazakh SSR. In the 1970s, the institute developed a...
Pages