The Danilov - Vologda - Konosha - Arkhangelsk railway line is a section of the Northern Railway. The road was built in the second half of the 19th century: the Vologda - Danilov section was...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Frunze - Kant - Tokmak - Rybachye railway line, passing through the territory of Kyrgyzstan, became a continuation of the existing Lugovaya - Frunze line. The road was built in order to...
Kotlas — Kozhva — Vorkuta railway line is a part of the North Pechora railway (since 1959 as part of the Northern Railway). The construction of the highway played an important role in supplying...
Железнодорожная линия Комсомольск-на-Амуре — Советская Гавань является восточным участком БАМа. Она была сооружена в годы Великой Отечественной войны с целью переброски войск и снаряжения на...
In the 1930s, the engineers of Lentransproekt (since 1951 - Lengiprotrans) developed facilities in the Far East. A section of the Sibirtsevo - Arseniev - Varfolomeevka Far Eastern railway was...
In the 1930s, engineers of Lentransproekt (since 1951 - Lengiprotrans) developed facilities in the Far East. A section of the Suchan-Daubikhe Far East railway was built according to the institute'...
Pages