Engineers of Lentransproekt (since 1951 - Lengiprotrans) have worked on various transport facilities in Karelia. In the post-war period, the institute designed a single-track railway line...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the construction project of the Gomel Electrotechnical Plant for the production...
The Novorossiysk Steam Locomotive Repair Plant (PVRZ) is an enterprise for the repair of passenger rolling stock and the production of a new formation of passenger wheelsets. It was founded in...
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) actively developed new projects. One of them was the project of the Gomel steam locomotive repair plant of the USSR Ministry of...
The Oktyabrsky Steam Locomotive Repair Plant is the oldest of the factories of the Ministry of Railways (MPS) for the manufacture of rolling stock. It was founded in 1826 as part of the...
In the post-war years, Lentransproekt (since 1951 - Lengiprotrans) was actively developing new projects. The engineers paid special attention to the reconstruction of railway infrastructure...
Pages
































