TCh-15 Leningrad-Baltiyskiy is a large multi-unit depot in St. Petersburg, founded in 1933. The depot was intended for lifting and periodic repairs, as well as technical inspection of sections...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The station at the Tallinn-Baltic station was built in 1870 on the Baltic Port - Revel - St. Petersburg railway line.
During World War II, the building was destroyed by fire in August 1941 and...
In the post-war years and later, Lengiprotrans engineers worked actively on various transport facilities in the Baltics. The implementation of the project of a new capital road bridge contributed...
Karasuk - Kamen-na-Obi section of the West Siberian railway, passing in the south of the Siberian Federal District of Russia.
In the 1950s, Lengiprotrans developed a project for the...
Engineers of Lentransproekt (since 1951 - Lengiprotrans) have worked on various transport facilities in Karelia. In the post-war period, the institute designed a single-track railway line...
The Pääsküla-Keila railway line is a section of the Tallinn-Keila railway in Estonia.
In November 1945, the Department of Electrification and Power Supply was formed at Lentransproekt (since...
Pages


































