For many years Lengiprotrans has been developing the railway network in the Syrian Arab Republic. In the 1980s, the institute developed a project for the Tartus-Latakia line for operational...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the early 1980s, Lengiprotrans developed a project for a wheel-and-bogie workshop for a refrigerator depot at Valga station of the Estonian Railways.
Heating networks and ventilation were...
The Petrashunai - Gubernia railway line is a section of the Siauliai - Birzai line of the Lithuanian railway. The road was built as a single-track, narrow-gauge, 750 mm gauge.
In the period...
Tselinograd (now Astana) is a railway station of the Kazakhstan Railways in the capital of Kazakhstan, the city of Astana.
In the 1980s, the Lengiprotrans Department of Plants (now part of the...
Tallinn is a passenger railway station in the capital of Estonia. The directions Narva - Tallinn, Tallinn - Viljandi pass through it.
In the 1980s, Lengiprotrans developed a project to...
Riga-Precu II is a railway station on the Riga-Ergli line in Latvia. Here, work is carried out with freight trains and long-term storage wagons.
In Soviet times, the station was equipped to...
Pages