С 1956 года начался новый этап массовой электрификации железных дорог СССР, в результате увеличилась доля электротяги и тепловозной тяги. В этот период «Ленгипротранс» разработал проект...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Moskovsky railway station in St. Petersburg was designed according to a single project with the Leningradsky railway station in Moscow during the construction of the Nikolaev railway in the 19th...
Throughout its entire activity, Lengiprotrans has taken care not only of production areas, but also of the well-being of its employees. In this regard, a number of projects for residential...
Baltiysky railway station in Gatchina is located at the station of the Gatchina-Passenger-Baltic Oktyabrskaya railway.
Railway traffic from St. Petersburg to Gatchina was opened in 1872, and...
Throughout its entire activity, Lengiprotrans has taken care not only of production areas, but also of the well-being of its employees. In this regard, a number of projects for residential...
In 1950-1960s Lengiprotrans developed a project for a railway post office in Riga. At this facility, for the first time in the transport architecture, a large-span folded prefabricated reinforced...
Pages
































