Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
Мостовой переход через реку Нура
The department of bridges of Lentransproekt (since 1951 - Lengiprotrans) developed a project for the capital construction of a bridge over the Nura river on the Karaganda railway in 1946....
  • 1940 — 1949
  • 1950 — 1959
Мостовой переход через реку Юра
In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
  • 1940 — 1949
  • 1950 — 1959
Вокзал на станции Валга
Valga station is located on the Tartu-Valga railway line in the south of Estonia. It is a border crossing, through which the transition from Estonia to Latvia is carried out. During the Second...
  • 1940 — 1949
  • 1950 — 1959
Вокзал на станции Кохтла
Kohtla station is located on the Tallinn - Narva railway line. During the Second World War, the station at the station was destroyed. In the postwar years, Lentransproekt (since 1951 -...
  • 1940 — 1949
  • 1950 — 1959
Железнодорожный мост через реку Вилия
In the 1940s – 1950s, Lengiprotrans designed a new capital bridge across the Vilia (also Neris) river at 31 km of the Vilnius-Turmantas railway section of the Lithuanian railway. Working drawings...
  • 1940 — 1949
  • 1950 — 1959
Новый капитальный автодорожный мост через реку Пярну в курортном районе Эстонии взамен разрушенного моста
In the post-war years and later, Lengiprotrans engineers worked actively on various transport facilities in the Baltics. The implementation of the project of a new capital road bridge contributed...
Pages