Daugavpils is a junction railway station of the Latvian Railway. Through it, trains follow in the direction of the stations: Krustpils, Rezekne, Egleine, Indra.
In the period 1956-1970,...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1950s and later, Lengiprotrans engineers worked in the Baltics. The railway overpass at the intersection of Brassa Street in Riga was designed by order of the USSR Ministry of Railways. In...
Railway line Magnitogorsk — Tobol — a section of the line Magnitogorsk — Tobol — Zhelezorudnaya — Astana, providing transport links between Kazakhstan and the Urals and the Volga region...
From the very foundation Lengiprotrans took an active part in the transport development of the Kazakh SSR. In 1954, a large-scale development of virgin and fallow lands began in the republic and a...
By order of the Ministry of Transport Construction of the USSR, Lengiprotrans designed the Chudovsky Reinforced Concrete Sleepers Plant (RCS). In the 1960-1970s, due to the growth of cargo...
From the beginning of its activity Lengiprotrans took an active part in the transport development of the Kazakh SSR. In the 1950s - 1960s, the institute created a project for a new railway line...
Pages









