The highway bridge was designed and built in the 1960s and is located on the 1198 km of the Leningrad-Murmansk highway (the current name is R-21 "Kola").
Before the construction of the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Tallinn-Baltic railway station was built in 1870 as the main station on the Baltic Port - Revel - St. Petersburg railway. During the Second World War, the building was badly damaged. In the...
In the 1960s, Lengiprotrans participated in the design of buildings and structures on the Latakia - Oronte and Kamyshli - Aleppo - Oronte railways under construction in the Syrian Arab Republic....
During the development of virgin lands Lengiprotrans designed 5 new large state farms in the Pavlodar region of the Kazakh SSR. Including the project of the state farm "Zholkuduk" was...
The railway line Karaganda - Tselinograd (now Astana) - Atbasar is a section of the Karaganda - Magnitogorsk meridional route, which provides transport links between Kazakhstan and the enterprises...
In 1950-1960s Lengiprotrans designed a bridge over the Abakan River as part of the construction of the Kyzyl - Mazhalyk (Aktovrak) - Abaza highway. The construction of the route made it possible...