In the 1970s, Lengiprotrans developed a project for automatic blocking on the Kaisiadoris - Palyamonas - Gaizhunai section of the Lithuanian Railway. The object contains 20 arrows.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Sebezh is a border station on the Moscow - Riga line of the Oktyabrskaya railway. In the 1970s, Lengiprotrans developed a project for the Sebezh plant of the construction industry at the station....
Pavlodar is a railway station of the South Siberian Railway in the Pavlodar region of Kazakhstan.
In the 1970s, the Lengiprotrans Department of Plants (now part of the OPGS) designed a wagon...
The mining and processing plant (GOK) "Apatit" was established in 1929 on the basis of the Khibiny deposits of apatite-nepheline ores. The GOK mines apatite for the aluminum industry, processes...
The Apatity railway junction is part of the Oktyabrskaya Railway (OZhD) system. It includes 2 structural subdivisions of the Murmansk branch of the Russian Railways - the Apatitskaya track...
Titan is a railway station on the Apatity - Titan line of the October railway in the Murmansk region.
In the period 1970-1989, Lengiprotrans developed a project for the reconstruction of the...
Pages


































