During the Soviet period, Lengiprotrans took an active part in the design of new railway lines for the development of virgin lands in the Kazakh SSR. In the 1970s, the institute developed a...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1970-1980, Lengiprotrans developed a project for mechanization of the hump with the modernization of hump automation and electrical centralization at the Radviliskis station of the Lithuanian...
The railway section Tselinograd (now Astana) - Kokchetav (now Kokshetau) is a meridional line connecting the South Siberian and Central Siberian railways in Kazakhstan.
The Tselinograd -...
ТCH-8 Leningrad-Passenger-Moskovsky is an operational locomotive (formerly multiple-unit) depot at the St. Petersburg-Glavny railway station. The depot serves trains on the Moscow direction...
The Baikal-Amur Mainline (BAM) is the largest railway running through the territory of Eastern Siberia and the Far East in the direction of Taishet - Sovetskaya Gavan.
In 1960-1970s "...
The Baikal-Amur Mainline (BAM) is the largest railway passing through the territory of Eastern Siberia and the Far East in the direction of Taishet — Sovetskaya Gavan.
In 1960–1970,...
Pages