С 1956 года начался новый этап массовой электрификации железных дорог СССР, в результате увеличилась доля электротяги и тепловозной тяги. В этот период «Ленгипротранс» разработал проект...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1960s Lengiprotrans developed a project for a railway post office in Riga. At this facility, for the first time in the transport architecture, a large-span folded prefabricated reinforced...
The Nyandoma diesel locomotive depot is located on the Konosha - Arkhangelsk line, which is part of the Northern Railway (SZD). At present, it is divided into the operational locomotive depot TChE...
The Predportovaya refrigerated wagon depot is a mechanically cooled wagon depot at the Predportovaya station of the Oktyabrskaya Railway. It was founded in 1954 by order of the USSR Ministry of...
The Bui depot is located at the station of the same name on the Northern Railway. It was formed as a locomotive depot in 1905.
In the 1960s, Lengiprotrans developed a project for the...
In 1950-1980s Lengiprotrans developed a project for a washing and steaming station in the village of Vederniki, Smolensk Region. This complex was intended for washing and steaming railway tank...
Pages