In December 1939, in connection with the outbreak of the Soviet-Finnish war, the Government of the USSR issued a task for the accelerated construction of the Petrozavodsk-Suoyarvi railway to...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1930-1940s Lengiprotrans developed the general layout of the Riga railway junction. It was of strategic importance for the economic development of the Republic of Latvia and the Soviet Union as...
Since its founding, Lentransproekt (since 1951 — Lengiprotrans) has been engaged in the transport development of the Kazakh SSR for the development of areas of fallow virgin lands and deposits on...
The railway line Weymarn - Chudovo - Budogoshch, designed by Lentransproekt (since 1951 - Lengiprotrans), in the pre-war years operated as a single-track railway line on steam locomotive traction...
The Danilov - Vologda - Konosha - Arkhangelsk railway line is a section of the Northern Railway. The road was built in the second half of the 19th century: the Vologda - Danilov section was...
Pages