After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in designing the restoration of the destroyed transport...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Roslavl Carriage Repair Plant (VRZ) was established in 1868 as the Main repair shops of the Oryol-Vitebsk, Riga-Orlov, Moscow-Belarusian-Baltic railways. Initially, he carried out the repair...
The temporary railway line Polyana — Shlisselburg, known as the Victory Road, played a huge role in the fate of besieged Leningrad during the Great Patriotic War.
On January 18, 1943, Soviet...
The single-track railway line of the Sverdlovsk railway, on a steam-locomotive traction with a baton method, was built according to the project of Lentransproekt (since 1951 - Lengiprotrans) in...
Prospecting and design work along the Voybokalo - Ladoga Lake line was carried out by employees of the Vologda expedition and the Leningrad project group in the most unfavorable conditions of a...
During the Great Patriotic War, with the participation of Lentransproekt employees (since 1951 - Lengiprotrans), the Stalingrad - Saratov - Sviyazhsk railway line was designed and built to solve...
Pages