Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1980 — 1989
Реконструкция моста черз отводящий канал на автодороге к Эстонской ГРЭС
In the late 1980s, Lengiprotrans developed a project for the reconstruction of a bridge across the diversion canal on the road to the Estonian State District Power Plant in the city of Narva.
  • 1980 — 1989
  • 1990 — 1999
Сортировочная станция Кошта
Koshta is a sorting station of the Northern Railway in the Cherepovets District of the Vologda Oblast. The project of Koshta station was carried out by Lengiprotrans as part of the...
  • 1970 — 1979
Станция Алитус-Новая
Alytus is a railway station on the Šeštokai - Alytus line of the Lithuanian Railway. In 1978 Lengiprotrans carried out design and survey work at the station. Longitudinal and transverse...
  • 1960 — 1969
Генеральная схема развития Ленинградского узла на 1980–1985 годы
Since the middle of the last century, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1960-1970s, the...
Pages