In the 1970s, Lengiprotrans developed a project for the Apatity railway junction in connection with the construction of an external railway transport for the Apatity mining and processing plant (...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
In the 1990s, Lengiprotrans developed a project for the electrification of the single-track section Chudovo - Novgorod (since 1999 - Veliky Novgorod) of the Oktyabrskaya Railway. Here, for the...
Narvskaya - Novy Port - a section of the St. Petersburg railway junction, is part of the Oktyabrskaya railway.
In the 1970s, according to the Lengiprotrans project, the line was equipped with...
In the 1950s – 1970s, the projects of the former Lengiprotrans Plant Department were related to the post-war restoration of the industry, the development of production capacities of transport...
In the late 1980s, Lengiprotrans developed a project for the reconstruction of a bridge across the diversion canal on the road to the Estonian State District Power Plant in the city of Narva.