Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
Оборудование автоблокировкой участка Ручьи — Парголово
Ruchyi - Pargolovo - a section of the St. Petersburg - Vyborg direction of the Oktyabrskaya railway. In the 1970s, according to the Lengiprotrans project, the Leningrad-Sortirovochny-Moskovsky...
  • 1990 — 1999
Цех технического обслуживания пассажирских вагонов на станции Калининград
In the 1990s, Lengiprotrans developed a project for a workshop for the maintenance of passenger cars at the Kaliningrad station. A building with utilities was designed for technical inspection of...
  • 1980 — 1989
ЭЦ разъезда Цементный завод
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea. The...
  • 1970 — 1979
Пункт подготовки вагонов на станции Апатиты
In the 1970s, Lengiprotrans developed a project for the Apatity railway junction in connection with the construction of an external railway transport for the Apatity mining and processing plant (...
  • 1940 — 1949
  • 1970 — 1979
Вильнюсский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway facilities destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and a...