The department of bridges of Lentransproekt (since 1951 - Lengiprotrans) developed a project for the capital construction of a bridge over the Nura river on the Karaganda railway in 1946....
In the 1940s – 1950s, Lengiprotrans designed a new capital bridge across the Vilia (also Neris) river at 31 km of the Vilnius-Turmantas railway section of the Lithuanian railway. Working drawings...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in the restoration of the destroyed transport infrastructure...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in designing the restoration of the destroyed transport...
In 1981, Lengiprotrans developed a project for the reconstruction of a bridge over the Tovarny stream in 1981 as part of the track reconstruction of the Kaliningrad-Sortirovochny station.
In the 1950s, Lengiprotrans developed a project for the overhaul of the bridge over the Pissa River at 912 km of the Virbalis - Kaliningrad section of the Lithuanian Railway.