Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
  • 1980 — 1989
Механизация сортировочной горки станции Радвилишкис
In 1970-1980, Lengiprotrans developed a project for mechanization of the hump with the modernization of hump automation and electrical centralization at the Radviliskis station of the Lithuanian...
  • 1970 — 1979
  • 1980 — 1989
Устройства СЦБ и связи на перегоне Пярну-Грузовая — Пярну-Пассажирская
In 1976-1980, Lengiprotrans developed a project for laying cable communication lines on the Pärnu Gruzovaya - Pärnu-Passenger section in Estonia.
  • 1970 — 1979
Электрическая централизация на станции Лийва
In the 1970s, Lengiprotrans prepared a project for electrical interlocking at Liiva station for 30 switches. A compressor station and a transformer substation were designed at the station.
  • 1970 — 1979
Автоблокировка на участке Кайшядорис — Палямонас — Гайжюнай
In the 1970s, Lengiprotrans developed a project for automatic blocking on the Kaisiadoris - Palyamonas - Gaizhunai section of the Lithuanian Railway. The object contains 20 arrows.
  • 1970 — 1979
Диспетчерская централизация на участке Краслау — Даугавпилс
Railway line Kraslau (now Kraslava) - Daugavpils - a section of the Indra - Daugavpils line of the Latvian Railway. Dispatch centralization for 28 switches on the Kraslau - Daugavpils section...
  • 1970 — 1979
Электрическая централизация на станции Даугавпилс II
In the 1970s, Lengiprotrans developed a project for route-relay electrical interlocking (EC) for 85 switches at Daugavpils II station. 