In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge crossing on the Southern bypass of the city of Kaliningrad across the Pregolya River. The length of the structure...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The bridge crossing over the Vorkuta River was designed on the highway in the city of Vorkuta in the area of CHPP-2. The length of the structure is 160 m.
In the 1990s, Lengiprotrans developed a project for a service tunnel under highway No. 2 in the town of Krasnoe Selo, Leningrad Region. The length of the structure is 136 m.
In 1980-1990, Lengiprotrans developed a project for the construction of a highway overpass between the IV and V micro-districts of Lasnamäe in Tallinn. Power supply was also designed at the...
Engineers of Lengiprotrans worked on various projects in the Baltics, including road projects. Thus, the automobile overpass at the intersection of the Southern Bypass with the railway access...
In the second half of the 1980s, Lengiprotrans engineers developed a project for a road bridge over the Emajõgi River. The construction of a road bridge designed by Lengiprotrans, carried out by...
Pages