Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1960 — 1969
Участок автодорожной магистрали Сегежа — Кандалакша
The Leningrad - Petrozavodsk - Murmansk highway is one of the northernmost federal highways in Russia, partly beyond the Arctic Circle and goes to the border with Norway. The road connected two...
  • 1960 — 1969
  • 1970 — 1979
Автомобильные дороги в Ленинградской области
In the 1960s – 1970s, Lengiprotrans prepared projects for highways in the Leningrad Region by order of the USSR Ministry of Agriculture. A major overhaul of the existing roads was planned with...
  • 1960 — 1969
Участок автомагистрали Зашеек — Мурманск
The Leningrad - Petrozavodsk - Murmansk highway is one of the northernmost federal highways in Russia. It partially lies beyond the Arctic Circle and goes to the border with Norway. The road...
  • 1960 — 1969
Кавказская перевальная автодорога
The Transcaucasian Highway is a federal highway linking Russia with the Transcaucasus and, in particular, with the Republic of South Ossetia. The decision to build it was made in 1958 by the USSR...