In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Back in the pre-war period, Lentransproekt (since 1951 — Lengiprotrans) started design and survey work on the Kartaly — Akmolinsk (now Astana) — Pavlodar line, which became an important link in...
The department of bridges of Lentransproekt (since 1951 - Lengiprotrans) developed a project for the capital construction of a bridge over the Ishim river on the Karaganda railway in 1946...
The department of bridges of Lentransproekt (since 1951 - Lengiprotrans) developed a project for the capital construction of a bridge over the Nura river on the Karaganda railway in 1946....
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in designing the restoration of the destroyed transport...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in the restoration of the destroyed transport infrastructure...
Pages
- 1
- 2