Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1990 — 1999
  • 2000 — 2009
Автодорожный обход Нарвы и Ивангорода с мостовым переходом через реку Нарву
The project of a road bypass for Narva and Ivangorod with a bridge over the Narva River was developed by Lengiprotrans in the 1990s - early 2000s. During the implementation of the project, level...
  • 1990 — 1999
Автодорожный мост через реку Ботуобия
The bridge crossing over the Botuobiya river was designed on the Yakutsk - Vilyuisk - Mirny highway in the Republic of Sakha (Yakutia). The length of the structure is 352 m.
  • 1990 — 1999
Реконструкция автодорожного моста через реку Ловать
In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge over the Lovat River in the town of Kholm, Novgorod Region. The length of the structure is 212 m.
  • 1990 — 1999
Реконструкция автодорожного моста через реку Волхов
In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge over the Volkhov River in the city of Veliky Novgorod. The length of the structure is 650 m.
  • 1990 — 1999
Реконструкция автодорожного моста через реку Преголю
In the 1990s, Lengiprotrans developed a project for the reconstruction of a bridge crossing on the Southern bypass of the city of Kaliningrad across the Pregolya River. The length of the structure...
  • 1990 — 1999
Автодорожный мост через реку Воркуту
The bridge crossing over the Vorkuta River was designed on the highway in the city of Vorkuta in the area of ​​CHPP-2. The length of the structure is 160 m.
Pages