In 1970-1980, Lengiprotrans developed a project for mechanization of the hump with the modernization of hump automation and electrical centralization at the Radviliskis station of the Lithuanian...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1976-1980, Lengiprotrans developed a project for laying cable communication lines on the Pärnu Gruzovaya - Pärnu-Passenger section in Estonia.
In the 1970s, Lengiprotrans prepared a project for electrical interlocking at Liiva station for 30 switches. A compressor station and a transformer substation were designed at the station.
In the 1970s, Lengiprotrans developed a project for electrical interlocking with mechanization of the hump at Ülemiste station of the Estonian Railways. The object contains 151 arrows, 2 beams of...
The railway section Polotsk - Vitebsk is part of the Belarusian Railway.
In the 1970s, the Department of Automation, Telemechanics and Communications of Lengiprotrans developed an author's...
In the 1970s, Lengiprotrans developed a project for dispatching centralization of the frequency system on the Kraslava - Daugavpils railway section, which connected the Belarusian and Latvian...