Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Устройства СЦБ и связи на станции Акмолинск
Akmolinsk (now Astana) is a railway station in the capital of Kazakhstan. In 1950-1970, during the transport development of virgin lands and coal deposits of the Kazakh SSR, Lengiprotrans...
  • 1950 — 1959
  • 1960 — 1969
Устройства СЦБ и связи на станции Даугавпилс
Daugavpils is a junction railway station of the Latvian Railway. Through it, trains follow in the direction of the stations: Krustpils, Rezekne, Egleine, Indra. In the period 1956-1970,...
Pages