Carrying out a complex of engineering surveys requires a large number of equipment and vehicles. In this regard, in 1950-1960, specialists from the Architectural and Construction Department...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1950s, Lengiprotrans developed a project for the Avtodetal plant for the manufacture of spare parts for cars at the Gryazi station of the South-Eastern Railway.
The enterprise was...
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. So, by the mid-1950s, a project was developed for plumbing workshops in Akmolinsk (since 2019 -...
"Lentransproekt" (since 1951 - "Lengiprotrans") worked on the design of many objects in Kazakhstan. In the post-war years, according to his project, production facilities were built for...
Esil is a railway station in the Akmola region of Kazakhstan. Directions to Astana, Kartaly and Arkalyk pass through it.
In the period 1946-1955, Lengiprotrans designed a landfill at the...
Kostanay (now Kostanay) is a railway station in the Kostanay region of Kazakhstan. Trains to Chelyabinsk, Astana, Alma-Ata, Karaganda, Arkalyk pass through it. Suburban trains also run to...