The bridge crossing over the Vorkuta River was designed on the highway in the city of Vorkuta in the area of CHPP-2. The length of the structure is 160 m.
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1990s, Lengiprotrans developed a project for a service tunnel under highway No. 2 in the town of Krasnoe Selo, Leningrad Region. The length of the structure is 136 m.
In the 1990s, Lengiprotrans developed a project for the reconstruction of a road bridge across the Yandebu River in the Leningrad Region. The length of the structure is 195 m.
In the 1990s, Lengiprotrans developed a project for a pedestrian bridge over the Vazhinka River in the village of Vazhiny. The length of the structure is 285 m.
In the 1980s, Lengiprotrans began developing a project for the Obskaya - Bovanenkovo line, the northernmost railway in the world. The road was intended for the development of the Bovanenkovskoye...
The bridge over the Indigirka River is designed for 974 km of the reconstructed Magadan-Yakutsk highway in the Republic of Sakha (Yakutia). The length of the structure is 310 m.
Pages