The Chita railway junction is a large junction on the Trans-Siberian Railway.
In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development and reconstruction...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Irkutsk railway junction is a large junction of the East Siberian railway.
In the pre-war period Lentransproekt (since 1951 - Lengiprotrans) drew up a project for the development and...
The Vladivostok railway junction is a large transit junction of the Trans-Siberian Railway. Here, cargo is transshipped from the Vladivostok Sea Trade Port to the railroad, and cargo flows from...
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
For many years, Lengiprotrans has been developing a general scheme for the development of the St. Petersburg (formerly Leningrad) railway junction. In the 1950s, the institute developed a general...
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway facilities destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and a...
Pages