Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
  • 1950 — 1959
Вокзал на станции Таллин-Садам
The train station at Tallinn-Sadam station was destroyed during the Second World War. In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the restoration of...
  • 1940 — 1949
  • 1950 — 1959
Вокзал Курск
The Kursk railway station was built in the 19th century at the terminal station of the Moscow-Kursk railway. During the Second World War, when the city was occupied by German troops, the...
  • 1940 — 1949
  • 1950 — 1959
Вокзал Новгород
The Novgorod railway station is located at the Novgorod-on-Volkhov station of the Oktyabrskaya railway. The first wooden station was built in the 19th century on the line connecting Veliky...
  • 1940 — 1949
  • 1950 — 1959
Вокзал Даугавпилс
Daugavpils railway station is located in the second largest city in Latvia. It was built in the 19th century on the former Petersburg-Warsaw railway. The building was destroyed during the...
Pages