In the 1940s – 1950s, Lengiprotrans designed a new capital bridge across the Vilia (also Neris) river at 31 km of the Vilnius-Turmantas railway section of the Lithuanian railway. Working drawings...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the post-war years, the Department of Bridges of "Lentransproekt" (since 1951 - "Lengiprotrans") was engaged not only in the restoration of destroyed objects, but also in the design of new...
In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
In the post-war years, Lentransproekt's Bridges Department (since 1951 - Lengiprotrans) was engaged not only in the restoration of destroyed objects in the Baltic republics, but also in the design...
In the 1950s, Lengiprotrans developed a project for the overhaul of the bridge over the Pissa River at 912 km of the Virbalis - Kaliningrad section of the Lithuanian Railway.
Pages
- 1
- 2