The department of bridges of Lentransproekt (since 1951 - Lengiprotrans) developed a project for the capital construction of a bridge over the Ishim river on the Karaganda railway in 1946...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The department of bridges of Lentransproekt (since 1951 - Lengiprotrans) developed a project for the capital construction of a bridge over the Nura river on the Karaganda railway in 1946....
In the 1940s – 1950s, Lengiprotrans designed a new capital bridge across the Vilia (also Neris) river at 31 km of the Vilnius-Turmantas railway section of the Lithuanian railway. Working drawings...
In the post-war years, the Department of Bridges of "Lentransproekt" (since 1951 - "Lengiprotrans") was engaged not only in the restoration of destroyed objects, but also in the design of new...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in designing the restoration of the destroyed transport...
After the blockade of Leningrad was lifted, a group of specialists from Lentransproekt (since 1951 - Lengiprotrans) was engaged in the restoration of the destroyed transport infrastructure...
Pages
- 1
- 2