Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 2010 — 2019
Автодорожный путепровод на пересечении железнодорожных путей в Гатчинском районе
In the 2010s, Lengiprotrans developed a project for an overpass at the intersection of railways and a public highway in the Gatchinsky District of the Leningrad Region. A three-span, two-lane...
  • 2010 — 2019
Автодорожный путепровод на станции Возрождение
The highway overpass is designed at the intersection of the Vyborg - Kamennogorsk railway line with the Komsomolskoye - Priozersk highway near the Vozrozhdenie station of the Leningrad Region. The...
  • 2010 — 2019
Автодорожный путепровод на перегоне Таммисуо — Гвардейское
In the 2010s, Lengiprotrans developed a project for a road overpass on the Tammisuo - Gvardeyskoye section of the Vyborg-Kamenogorsk railway section to replace three closed crossings in the...