In the pre-war years, the engineers of Lentransproekt (since 1951 - Lengiprotrans) worked in Azerbaijan. According to their project, a single-track railway line was built on a steam locomotive...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In December 1939, in connection with the outbreak of the Soviet-Finnish war, the Government of the USSR issued a task for the accelerated construction of the Petrozavodsk-Suoyarvi railway to...
The Baikal-Amur Mainline, built in the 20th century, is still one of the largest transport construction projects in the world. "Lentransproekt" (since 1951 - "Lengiprotrans") from the moment of...
The railway line Pskov — Daugavpils — Vilnius is a section passing through the territory of Russia, Latvia and Lithuania.
The project of the second tracks on the site was developed by...
The railway line Weymarn - Chudovo - Budogoshch, designed by Lentransproekt (since 1951 - Lengiprotrans), in the pre-war years operated as a single-track railway line on steam locomotive traction...
From the moment of its foundation "Lentransproekt" (since 1951 - "Lengiprotrans") was engaged in the transport development of the Kazakh SSR. The railways were intended for the development of...
Pages