Железнодорожная линия Комсомольск-на-Амуре — Советская Гавань является восточным участком БАМа. Она была сооружена в годы Великой Отечественной войны с целью переброски войск и снаряжения на...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development of the Kuznetsk railway junction.
In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development of the Krasnoyarsk railway junction. This was due to the construction of the second track.
The Omsk railway junction is a large junction of the West Siberian railway.
In the pre-war period, Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development and...
The Kirov railway junction is located on the northern and new direction of the Trans-Siberian Railway. Passenger and freight traffic of the boiler, Glazov and Kotlas directions passes through it...
In 1935 "Lentransproekt" (since 1951 - "Lengiprotrans") worked on the creation of railway facilities in the Ukrainian SSR. The project of the Darnitsa Car Repair Plant, one of such facilities, was...
Pages