Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1935 — 1939
Железнодорожная линия Караганда — Балхаш
In the pre-war period, Lentransproekt (from 1951 — Lengiprotrans) designed the Karaganda-Balkhash railway line in the Kazakh SSR. The road is a continuation of the meridional highway Petropavlovsk...
  • 1935 — 1939
  • 1940 — 1949
Вторые пути на участке Котельнич — Пермь
Kotelnich - Perm - the railway section of the Kotelnich - Sverdlovsk (now Yekaterinburg) line of the Gorky Railway. In the 1930s, the Kirov and Molotov expeditions of Lentransproekt specialists...
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Алма-Ата
  • 1935 — 1939
  • 1940 — 1949
Магнитогорский железнодорожный узел
  • 1935 — 1939
  • 1940 — 1949
Железнодорожный узел Бертыс
  • 1935 — 1939
  • 1940 — 1949
Читинский железнодорожный узел
The Chita railway junction is a large junction on the Trans-Siberian Railway. In 1935-1941 Lentransproekt (since 1951 - Lengiprotrans) developed a project for the development and reconstruction...
Pages