The Velikie Luki Steam Locomotive Car Repair Plant (PVRZ) is an enterprise for the repair of various freight cars for the needs of railway transport. Its history begins with the arrival of the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
The Leningrad Electrotechnical Plant (LETZ) of the USSR Ministry of Railways was established in the 1930s on the basis of the signaling and communication service workshops of the October Railway...
In December 1939, in connection with the outbreak of the Soviet-Finnish war, the Government of the USSR issued a task for the accelerated construction of the Petrozavodsk-Suoyarvi railway to...
In the pre-war years, the engineers of Lentransproekt (since 1951 - Lengiprotrans) worked in Azerbaijan. According to their project, a single-track railway line was built on a steam locomotive...
The Frunze - Kant - Tokmak - Rybachye railway line, passing through the territory of Kyrgyzstan, became a continuation of the existing Lugovaya - Frunze line. The road was built in order to...
Pages