In 1950-1980, Lengiprotrans developed a project for a washing and steaming station Promyshlennaya in the Kemerovo region. This complex was intended for steaming and washing railway tanks and...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Konosha - Velsk - Kotlas is the southern section of the North-Pechora railway (since 1959 as part of the Northern Railway). The main line was built according to the project of Lentransproekt...
Diesel locomotive depot Dno (now Lokomotivnoe depot Dno) is located at the Dno junction station of the Oktyabrskaya railway. There are 2 main railway lines running through the station: Yaroslavl...
Tselinograd (now Astana) is a railway station of the Kazakhstan Railways in the capital of Kazakhstan, the city of Astana.
In the period 1950-1970s, the Department of Plants (now part of the...
The Nyandoma diesel locomotive depot is located on the Konosha - Arkhangelsk line, which is part of the Northern Railway (SZD). At present, it is divided into the operational locomotive depot TChE...
In 1960-1970, Lengiprotrans developed a project for the reconstruction of the railway station in the city of Saratov, built in 1871.
According to the project, it was planned to cut off a part...