Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1950 — 1959
  • 1960 — 1969
Устройства СЦБ и связи на станции Даугавпилс
Daugavpils is a junction railway station of the Latvian Railway. Through it, trains follow in the direction of the stations: Krustpils, Rezekne, Egleine, Indra. In the period 1956-1970,...
  • 1950 — 1959
  • 1960 — 1969
Железнодорожный путепровод на пересечении улицы Брасса в г. Рига
In the 1950s and later, Lengiprotrans engineers worked in the Baltics. The railway overpass at the intersection of Brassa Street in Riga was designed by order of the USSR Ministry of Railways. In...
  • 1950 — 1959
  • 1960 — 1969
Перевод железнодорожного участка Магнитогорск — Тобол на тепловозную тягу
Railway line Magnitogorsk — Tobol — a section of the line Magnitogorsk — Tobol — Zhelezorudnaya — Astana, providing transport links between Kazakhstan and the Urals and the Volga region...
  • 1970 — 1979
  • 1980 — 1989
Рижский ремонтно-механический завод
In the 1970s, the former Lengiprotans Plants Department developed a project for the Riga Mechanical Repair Plant. The project provided for: - Compressor station with a capacity of 40 cubic...
  • 1960 — 1969
  • 1980 — 1989
Станция Шауляй
In the 1950s, Lengiprotrans drew up a project to replace mechanical interlocking with relay interlocking with route control of switches and signals at Siauliai station. In 1965-1966, a complex...
  • 1950 — 1959
  • 1960 — 1969
Даугавпилсский завод сборных железобетонных конструкций треста «Балттрансстрой»
In 1950-1970s Lengiprotrans developed a project for the reconstruction of the Daugavpils plant of prefabricated reinforced concrete structures of the "Balttransstroy" trust. In 1980-1987,...
Pages