In 1950-1970, the former Department of Lengiprotrans Plants participated in the design of facilities related to the post-war reconstruction of the railway industry, the development of production...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1950s – 1960s, Lengiprotrans designed new railway lines for the development of virgin lands in Kazakhstan. The capital of the republic Akmolinsk (now Astana) became the center of railway...
Yaroslavl-Glavny is a marshalling yard of the Northern Railway. It was founded in 1898 with the original name Vspolye, and in 1952 it was renamed Yaroslavl-Glavny.
In 1950-1970s Lengiprotrans...
In the 1960s, the former Lengiprotrans Plants Department developed a project for an electric locomotive depot in Norilsk. This was due to the beginning of the replacement of steam locomotives on...
In the 1950s, Lengiprotrans developed a project for the development of the Sovetsk station in the Kaliningrad region. Longitudinal profiles, strengthening of the subgrade, track section and...
In 1950-1970s Lengiprotrans developed a design for a signaling and communication device at the Tallinn station in Estonia. Electrical interlocking of arrows and signals was installed.
Pages