Lengiprotrans is the author of many railway projects in Kazakhstan. So, in the first half of the 1980s, engineers developed a project for the preparation of wagons for loading at the Ekibastuz-II...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
Lengiprotrans has done a lot of work on the reconstruction of the carriage facilities and, first of all, car repair depots (WRD). Among other objects, the WFD was designed at the Ekibastuz II...
During the Soviet period, Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were designed, in...
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya — Bovanenkovo railway line. In particular, a locomotive depot was designed at the Obskaya station...
During the Soviet period Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were reconstructed, in...
Engineers of Lengiprotrans worked on various transport facilities in the Baltics. The railway crossing through the Klaipeda Canal — one of such objects — was designed to provide the necessary...