Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1970 — 1979
Автодорога Кировск — Африканда
The Kirovsk-Afrikanda highway passes through the territory of the Murmansk region. The project of the road was developed by the specialists of Lengiprotrans in the 1970s.
Pages