Completed projects

950
projects completed

Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.

Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.

The page shows the objects of the selected type, the design of which was performed in the selected period
  • 1940 — 1949
  • 1950 — 1959
Электрификация участка Кизел — Пермь
Railway line Kizel - Perm - a section of the Sverdlovsk railway. In the late 1940s, Lentransproekt (since 1951 - Lengiprotrans) developed a project for its electrification. During the design,...
  • 1940 — 1949
Вокзал на станции Кокчетав
In the postwar years, Lentransproekt (since 1951 - Lengiprotrans) developed a project for a station at the Kokchetav (now Kokshetau) station of the Karaganda railway. The exterior and interior...
  • 1940 — 1949
  • 1970 — 1979
Вильнюсский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway facilities destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and a...
  • 1940 — 1949
  • 1970 — 1979
Радвилишкский железнодорожный узел
In 1940-1950s "Lengiprotans" was engaged in the restoration of the railway infrastructure destroyed during the Great Patriotic War. During this period, the institute developed a general scheme and...
Pages