The Bui depot is located at the station of the same name on the Northern Railway. It was formed as a locomotive depot in 1905.
In the 1960s, Lengiprotrans developed a project for the...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In 1950-1980s Lengiprotrans developed a project for a washing and steaming station in the village of Vederniki, Smolensk Region. This complex was intended for washing and steaming railway tank...
The Kirishi washing and steaming station (PPS) is a structural subdivision of the St. Petersburg branch of the Oktyabrskaya railway. The project of the complex was developed by the Department of...
The Magnitogorsk depot is located at the station of the South Ural railway. In the 1960s – 1970s, Lengiprotrans developed a project for the reconstruction of the depot in connection with the...
Finlyandsky railway station was built in 1870 for the railway connecting St. Petersburg with the Grand Duchy of Finland. During the years of the blockade, it was the only operating station: the "...
In 1950-1980, Lengiprotrans developed a project for a washing and steaming station Promyshlennaya in the Kemerovo region. This complex was intended for steaming and washing railway tanks and...
Pages