During the Soviet period Lengiprotrans took an active part in the development of transport infrastructure in the Baltic countries. A large number of artificial structures were reconstructed, in...
The page shows the objects of the selected type, the design of which was performed in the selected period
950
projects completed
Site surveys for construction involve comprehensive investigations of natural environment of an area and/or a construction site.
Specialists of JSC Lengiprotrans design transport development master-plans, which includes activities associated with placement of all railway infrastructure facilities in accordance with the process solutions adopted. The design work includes environmental impact assessment and development of recommendations on environmental protection.
The page shows the objects of the selected type, the design of which was performed in the selected period
In the 1980s, the Lengiprotrans Plants Department designed facilities on the new Obskaya — Bovanenkovo railway line. In particular, a locomotive depot was designed at the Obskaya station...
In the 1980s, Lengiprotrans prepared a design for a washing and steaming station for servicing the Mazeikiai oil refinery at the Bugeniai station of the Lithuanian railway.
At the facility, the...
В 1970–1980-х годах инженеры «Ленгипротранса» продолжали работу над транспортными объектами в Прибалтике. Автодорожный путепровод, расположенный на пересечении Октябрьского проспекта с улицей 21...
In the 1970s – 1980s, Lengiprotrans engineers worked on various transport facilities in Estonia. One of such objects, the pedestrian bridge across Oktyabrsky Prospekt in the III microdistrict of...
In the 1970s Lengiprotrans developed a draft general layout for the Tallinn railway junction. A feasibility study for the development of the unit was prepared.
Pages