Railway line Nyandoma - Mudyuga - a section of the Northern Railway.
The project of sealing the colored chain on the line was prepared by Lengiprotrans in 1956. In the same period, similar work...
In the 1980s Lengiprotrans developed the project of the Tartus-Latakia railway line in the Syrian Arab Republic for the operational connection of two ports on the Mediterranean Sea.
The...
Pages


